Continuous Loss-in-Weight Blenders Chapter 3: Installation 25
Note: Ensure that the feed tube angle is steep enough (60 degrees is recommended).
Note: Some mezzanine mount applications will require the blending system’s lower
mass flow hopper be mounted on the extruder throat. The metering section
will be mounted on a small stand on the mezzanine directly above the extruder
with a 4” tube stub for gravity metered flow.
Note: This arrangement will be similar to the floor mounted configuration, discussed
in the following section, less the blower assembly.
Using the proper lifting equipment, lift the blender into place. Take care to ensure the proper
orientation of the blender and operator controls.
Note: The manufacturer assumes NO responsibility for any damages resulting from
improper installation or improper handling during the installation process.
Once properly positioned, securely fasten the blending system to the floor.
Floor Mount
In a floor mounting application, ensure adequate clearance for all blender operations and
maintenance. The operator and maintenance personnel must have access to all parts of the
blender. If necessary, it is the customer’s responsibility to provide adequate, safe work
platforms around the blender to meet state and local safety codes. For specific dimensions,
refer to the assembly diagram provided with each blender.
Note: Auger assemblies require a minimum of 24 inches of clearance for proper
servicing and cleaning.
Insure the chosen location for the blending system is adequately away from high traffic aisles.
Insure that normal day to day operations will not place the blending system at risk of damage.
Once a proper location has been chosen, securely fasten the blender floor stand frame to the
floor.
Note: The blending system MUST BE SECURELY LAGGED TO THE FLOOR before
operating the unit.
The floor mounted version has a blower and venturi that continually conveys the metered
blend to the processing machine mounted mass flow weigh hopper. The blower unit can be
placed in any position around the venturi and connected with a flexible hose. It is provided
for a straight hook up from the factory, but this can easily be field changed to any convenient
location, with additional tubing and a longer wiring conduit. These blenders have been
installed with the blower remote from the blender and connected with rigid aluminum tubing,
bends and Morris couplers. This is the customer’s preference. All conveying tubing is to be
provided by the customer and is not included with the blender pricing.
If the remote mass flow weigh hopper is located more than 25 feet from the blender control
panel, a load cell amplifier module may be required.
Note: The manufacturer assumes NO responsibility for any damages resulting from
improper installation or improper handling during the installation process.