Sub-Zero ICB700TR Refrigerator User Manual


 
5
TOOLS AND MATERIALS REQUIRED
The following is a list of tools and materials
that should be available for proper installation.
Phillips screwdriver set
Slotted screwdriver set
1.2 m of 6,35 mm copper tubing and saddle
valve for the water line—part #4200880
(do not use self-piercing valves)
Copper tubing cutter
Level—.6 m and 1.2 m recommended
Appliance dolly able to support 227 kg
and adequate help to handle the weight of
the unit
Various sized pliers
Wrench set
Allen wrench set
11 mm hex bolt nut driver
Crescent wrenches
Drill and assorted drill bits
Masonite, plywood, 3,175 mm pressed
fiberboard, cardboard or other suitable
material to protect finished flooring
Appropriate materials to cover and protect
the home and its furnishings during
installation
INSTALLATION
RECOMMENDATIONS
The importance of the installation of the
Sub-Zero Integrated unit cannot be overem-
phasized. Installation should be done by a
qualified installer.
Before you begin the installation process,
it is recommended that you read this entire
Installation Instructions book. There are key
details that you should take special care to
observe during the installation. By reading
these instructions carefully, you will make the
installation process easier, problem-free and,
most importantly, safe.
Any questions or problems about the
installation should be directed to your
Sub-Zero dealer. You can also visit our website
at subzero.com.
SITE PREPARATION
Make sure that the finished rough opening
where the Integrated unit is to be installed is
properly prepared. Refer to the Overall
Dimensions and Installation illustrations for
your specific model on the following pages.
Make sure that the rough opening dimensions,
door and drawer clearances, electrical service
and plumbing are correct for the model you
are about to install.
Be sure that the plumber, electrician and
cabinet installer have this information before
finishing work is completed.
IMPORTANT NOTE:
The inside edges of the
rough opening, as well as the sides and a
portion of the backside of the decorative
panels will need to be finished, as they will be
exposed when the doors are open.
INTEGRATED INSTALLATION RECOMMENDATIONS