13
Model 430 Torque Operating Procedures
Rotate the draw valve so the flats on the top of the draw
valve are perpendicular to the door face.
Figure 12
Insert the ice buster through the door spout and into
the slot located just above the lower o--ring.
Figure 13
With the ice buster in place, rotate the draw valve to
allow installation of the draw handle. This will lock the
ice buster in place. Install the draw handle pin, and
close the draw valve by moving the handle to the left.
Figure 14
Place the large rubber gasket into the groove on the
back side of the freezer door. Slide the white, plastic
front bearing onto the bearing hub, making certain that
the flanged end of the bearing is resting against the
freezer door. DO NOT lubricate the door gasket or
front bearing.
Figure 15
Step 6
Position the torque arm by inserting it through the slot
in the torque switch arm and down into the hole in the
torque rotor which protrudes from the door. Verify
proper installation by moving the torque rotor back and
forth to be sure it moves freely and easily.
Figure 16