Taylor RC25 Refrigerator User Manual


 
17
Models RD30/RC25 Operating Procedures
081029
Step 6
Install the handscrews on the studs. Tighten the
screws equally, using a criss--cross pattern. Do not
overtighten the handscrews.
Figure 21
Step 7
Install the torque arm. Position the torque arm by
inserting it throughthe slotin the torqueswitch armand
down into the hole in the torque rotor which protrudes
from the door . Verify proper installation by moving the
torque rotor back and forth to be sure it moves freely
and easily.
Figure 22
Step 8
Install the front drip tray and splash shield. Install
the front drip tray and the splash shield under the door
spout.
Figure 23
Sanitizing
Step 1
Fill System. Disconnect the product supply lines from
the mix delivery container. Prepare a pail of approved
100 PPM sanitizing solution (examples: 2--1/2 gal.[9.5
liters] of Kay--5R or 2 gal. [7.6 liters] of
Stera--SheenR). USE WARM WATER AND FOLLOW
THE MANUFACTURER’S SPECIFICATIONS. Pour
the solution into a clean, empty mix delivery container.
Connect the container to the mix delivery line.
Figure 24