Remove front panel to access the front leveling legs.
6a
Front Panel Removed
Front Panel Attached
5b
Front Panel Removed
Front Panel Attached
Installation Procedure (cont’d.)
18 19
Leveling legs will be raised during shipping. Adjust
front leveling legs down by using a 1/4 drive ratchet.
When the adjustment nut is visible, complete the
lowering of the legs from the top. When the legs are
down, tighten the locking nut on the top of the leg.
To level center rear leg, see Step 5a.
5c
(Standard discharge)
10B
Attach screws through trim pieces into cabinets.
(select models).
7
1.0”
(2.5 cm)
Cut here for 3/4”
(1.9 cm)
Cut here for 5/8”
(1.6 cm)
9
10A
(Discharge with food waste disposer)
Identify discharge connection size; cut line to
correct size and connect. Clamp if necessary.
Minimum
20”
(50.8 cm)
from floor
8
Install High Loop Clip, which is provided, a
minimum of 20” (50.8 cm) from the floor.
Installation Procedure (cont’d.)
7b
Attach screws through bracket into cabinets
(select models).
To check level, front to back, pull the top rack half-way
out of unit. The rack should remain stationary and not
move in or out. After unit is level, replace front panel
and ensure overflow channel is in place.
6