Vita-Mix T&G2 Blender User Manual


 
Gasket Installation Instructions:
1. Follow the instructions on page 8 on preparing the counter area for the installation of
your In-Counter T&G 2 Blending Station.
®
Also, use the Template Sheet (provided in your
machine’s original package) to assist you in the placement and ventilation of
your machine.
2. Lay the blender on its back with the motor pointing toward you. Allow 1-2 in. (2.54 -5.08 cm)
of the motor base to hang over the edge of the counter top to facilitate easy fitting of the
gasket.
3. Slide the power cord through the gasket, with the groove of the gasket pointing toward the
machine base.
4. Starting at one corner of the motor base, press the gasket onto the motorbase, so that the
groove in the gasket seats itself onto the stepped bottom edge of the motor base.
5. Working around the bottom edge of the motor base, press the gasket onto the motor base
until the entire perimeter of the gasket is firmly attached to the motor base.
6. Carefully place the blender into the hole in the counter.
7. Be sure that the gasket is properly seated on the motor base and against the counter top.
8. Do not secure the machine to the counter with bonding materials.
This gasket was designed to protect your machine from water damage and to
reduce noise. Failure to properly install this gasket could result in moisture
damage.
n-Counter Gasket
Front
Back
10
I