Vulcan-Hart ECO2C Convection Oven User Manual


 
HALF-SIZE CONVECTION OVENS - REMOVAL AND REPLACEMENT OF PARTS
9
BURNER (GAS OVENS)
WARNING:
UNPLUG UNIT BEFORE SERVICING.
WARNING:
SHUT OFF THE GAS BEFORE
SERVICING THE UNIT.
1. Remove racks and the right rack support.
2. Remove baffle panel by lifting up and out.
3. Remove the right side panel as outlined under
COVERS AND PANELS.
4. Disconnect the lead wires to the electrode
assembly.
5. Remove the heat exchanger as outlined under
HEAT EXCHANGER.
6. Remove the screws from the burner bracket
and pull the burner into the oven cavity.
7. Remove the screws that secure the electrodes
to the burner bracket.
8. Reverse procedure to install.
NOTE:
When installed, the electrodes are
positioned toward the front of the oven.
GAS VALVE (GAS OVENS)
WARNING:
UNPLUG UNIT BEFORE SERVICING.
WARNING:
SHUT OFF THE GAS BEFORE
SERVICING THE UNIT.
WARNING:
ALL GAS JOINTS DISTURBED
DURING SERVICING MUST BE CHECKED FOR
LEAKS. CHECK WITH A SOAP AND WATER
SOLUTION (BUBBLES). DO NOT USE AN OPEN
FLAME.
A. CHECK ALL JOINTS PRIOR TO THE
GAS VALVE BEFORE LIGHTING UNIT.
B. CHECK ALL JOINTS BEYOND GAS
VALVE AFTER UNIT IS LIT.
1. Remove the right side panel and control panel
as outlined under COVERS AND PANELS.
2. Disconnect the lead wires at the gas valve.
3. Disconnect the gas line fitting going to the
burner at the top of the gas valve.
4. Remove the gas valve from the nipple between
the it and the manual gas valve.
5. Reverse procedure to install.
6. Adjust the gas valve as outlined under GAS
PRESSURE ADJUSTMENT.