C. TOP GRID
1. Prepare grid casting by applying a small amount of
anti-sieze paste to all threaded holes.
2. Feed wires 5, 6 & 20 thru the right feed-thru hole.
Attach wires 5 & 6 to the element terminals. Attach
wire 20 to the center-most boss at the front of the
casting.
3. Pull the wires back until they have only a small
amount of slack. Seal both sides of both feed-thru
holes with hi-temperature silicone sealant.
4. Install the grid cover.
D. BOTTOM GRID
1. Prepare grid casting by applying a small amount of
anti-sieze paste to all threaded holes.
2. Set the grids waffle-side down, and with the rear
portions touching. This positions the grids properly
for later assembly.
3. Feed the temperature probe leads and wire 10 thru
the hi-temp tubing, then thru the left feed-thru hole.
4. Feed wires 5, 6, & 20 (from top grid) and wires
7 & 8 thru the right feed-thru hole. Attach wires
5 & 8 to one element terminal, and wires 6 & 7
to the other element terminal.
5. Set the temperature probe between the two screw
bosseswith its round nose pointing to the right.
Slide the retainer over the probe. Install the screws
with wires 10 & 20 attached to the center-most screw
boss.
6. Route wires as shown. Pull the wires and hi-temp
tubing back until they have only a small amount of
slack. Seal both sides of both feed-thru holes with
hi-temperaturesilicone sealant.
7. Install the grid cover.
8
5
6
8
7
20
10
HI-
TEMP
TUBING
TEMP
PROBE
PROBE
RETAINER
GRID
see page 11