Wolf Pro Wall Ventilation Hood User Manual


 
10
WOLF PRO WALL CHIMNEY VENTILATION HOODS
ACCESSORIES
Optional acces-
sories are available
through your
Wolf dealer. To
obtain local dealer
information, visit
the Locator section
of our website,
wolfappliance.com.
DUCT COVER INSTALLATION
Optional
Duct
Cover
Mounting
Screws
Duct cover installation
Installing a duct cover assembly will
impact all aspects of the hood installa-
tion including hood location, ducting,
electrical placement and the mounting
surface.
Duct covers 6" (152), 12" (305), 18" (457) and
24" (610) high in widths to match all wall
chimney hoods are available through your
Wolf dealer. To obtain local dealer information,
visit the Locator section of our website,
wolfappliance.com.
IMPORTANT NOTE:
If internal blower Model
CTBLOWER-60INT or CTBLOWER-90INT will be
used with the 36" (914) or 42" (1067) wide
hood, do not install the duct cover yet. The
internal blower must be installed before
installing the duct cover.
IMPORTANT NOTE:
If an optional duct cover
is to be used with the Pro wall chimney hood,
follow these instructions before installing the
hood:
Attach the duct cover from the inside of the
hood through the filter opening using the
screws provided with the duct cover.
Leave the screws partially loose until all
screws are installed. Check the alignment of
the duct cover with the hood and tighten
the four corner screws to secure the duct
cover. Tighten all remaining screws.