14
Installation of CO
2
Air Line Hose t o Re gulator
? Attach the open end of the red hose provided to the hose barb
connection on the regulator.
? Secure hose by using the steel clamp provided. Use
Pliers/screwdriver to tighten clamp and assure no leaks.
(See Figure 7 )
Figure 7
Installation Of The Beer Tower
? Remove the top plug by twisting and pulling out, saving it for later use if you decide to convert unit
to an all refrigerator.
? Unravel the beer line (clear hose) from the tower and insert the beer line and wing nut through the
uncovered hole on top.
? Lock the beer tower assembly to the top and make sure to position the beer faucet so it is aligned
with the cabinet front (6 o’clock position). You accomplish this by aligning the bottom of the beer
tower to the 3 grooves on the top cabinet and tighten by hand clockwise to properly lock.
WARNING
THE BEER TOWER ASSEMBLY OF YOUR UNIT COMES WITH A FLAT MYLAR WAS HER.
YOUR UNIT MAY NOT REQUIRE THE USE OF THIS WASHER AS TOWER IS DESIGNED FOR A
TIGHT AND SECURE FIT.
HOWEVER, WHILE INSTALLING THE TOWER TO THE UNIT THIS WASHER CAN BE USED FOR
A TIGHTER FIT IF NECESSARY.
Connecting the Beer Tower to Coupler
? Make sure the washer is properly inserted into the wing nut.
? Place wing nut into the top of the coupler turning until tight.
How to Tap a Keg of Beer
? Make sure the beer tower faucet is in the closed position.
? Pull tapping handle out and press downward until it locks into
position. (See Figure 8) The keg is now tapped.
Figure 8
Opening the CO
2
Cylinder Main Valve
? Before doing that, make sure the secondary shut-off valve is
closed, as shown in figure 9. To open the main CO
2
cylinder valve,
slowly turn the main valve counter-clockwise until fully open.
? Notice the needle on the gauge start to climb.
Figure 9