Breville the Dual Boiler Espresso Maker User Manual


 
36 37
e) Close both valves by rotating screws
clock-wise until seated. Do not
overtighten screws to avoid damaging
the valves.
f) Empty drip tray and reinsert into
position. Use caution as the drip tray
may be hot due to the water and steam
from the boilers.
g) Empty water tank, remove water filter.
h) Empty descale solution into water tank,
then top with cold water to MAX line,
or as per manufacturer’s instructions.
Replace and lock water tank back into
position at the back of the machine.
i) Press MANUAL button to proceed to
the next step.
NOTE
If boilers are not empty, the machine
will beep 3 times and ‘vALv’ will be
displayed on the LCD.
Step 3 – Begin Descale
a) 20 minute timer will begin. Machine
will fill boilers with descale solution and
heat to temperature. During this time,
water may flow through the group head.
Wait for countdown timer to finish.
This allows solution to dissolve scale
build up.
b) The LCD will display ‘PUSH’ when the
timer has finished.
Step 4 – Empty Descale Solution
a) Empty water tank then rinse and fill
with clean water to the MAX line.
Replace and lock water tank back into
position at the back of the machine.
NOTE
If water tank has not been removed
then replaced or is empty, water tank
LED will flash 5 times, the machine
will beep 3 times and ‘FILL TANK’ will
be displayed on the LCD.
b) Place a cloth over the drip tray to stop
steam escaping.
c) Use a flat-head screwdriver to rotate the
right screw counter-clockwise until the
valve is fully open. As the valve opens,
steam may be released.
CAUTION
HOT WATER & STEAM
CARE & CLEANING
d) Next, repeat the process on the left
screw. As the valve is opened, water may
begin flowing into the drip tray.
e) Allow valves to remain open until no
more water or steam escapes.
f) Close both valves by rotating screws
clock-wise until seated. Do not
overtighten screws to avoid damaging
the valves.
g) Empty drip tray and reinsert into
position. Use caution as the drip tray
may be hot due to the water and steam
from the boilers.
h) Press MANUAL button to proceed to
next step.
Step 5 – Fill Boilers
a) 5 minute timer will begin. During this
time, water may flow through the group
head. Wait for countdown timer to finish.
This allows any remaining solution to be
removed from the system.
b) The LCD will display ‘PUSH’ when the
timer has finished.
Step 6 – Flush Boilers
a) Empty and rinse water tank. Assemble
new water filter into tank.
b) Fill water tank with cold water to MAX
line. Replace and lock water tank back
into position at the back of the machine.
c) Ensure drip tray is empty and fully
inserted into position.
d) Place a cloth over the drip tray to stop
steam escaping.
e) Use a flat-head screwdriver to rotate the
right screw counter-clockwise until the
valve is fully open. As the valve opens,
steam may be released.
CAUTION
HOT WATER & STEAM
f) Next, repeat the process on the left
screw. As the valve is opened, water may
begin flowing into the drip tray.
g) Allow valves to remain open until no
more water or steam escapes.
h) Close both valves by rotating screws
clock-wise until seated. Do not
overtighten screws to avoid damaging
the valves. Replace the grey silicone
cover over the valves.
i) Empty drip tray and reinsert into
position. Use caution as the drip tray
may be hot due to the water and steam
from the boilers.
j) Press MANUAL button to complete
descale procedure. Machine will heat
up and is ready to use once operating
temperature (STANDBY mode)
is reached.
CARE & CLEANING