Bunn G9WD-RH Coffee Grinder User Manual


 
4
ELECTRICAL REQUIREMENTS
This grinder has an attached cord set and requires 2-wire, grounded service rated 120 volts ac, 15 amp,
single phase, 60 Hz.
OPERATING CONTROLS
Grind Pad (a)
Pressing initiates a grind cycle.
Stop Pad (b)
Pressing ends the operation of the grinder.
® Pad (c)
Pressing the copyright pad allows programming access.
Pads (d)
“Hidden” buttons used to navigate setup and programming menus.
Pads (e)
Press button to select small, medium or large batch size.
41451.0001 111909
d
a
b
c
e