Bunn ITCB-DV Coffeemaker User Manual


 
Page 51
PROGRAMMING THE BREWER (cont.)
PROGRAMMING FUNCTIONS - LEVEL 2 (cont.)
CALIBRATE FLOW (Continued)
Procedure to calibrate the dilution flow rate:
1. Place a container, accurately graduated and with
a minimum capacity of 130 ounces, beneath the
funnel.
NOTE: If the display is already on the DILUTION CAL
screen, skip steps 2 & 3 and proceed directly to step
4.
2. Press and hold the right hidden button until the
display reads SET LANGUAGE. Press the right
hidden button until the display reads CALIBRATE
FLOW.
3. Press and release YES to advance to the SPRAY
HEAD CAL function screen. Press and release NO
to advance to DILUTION CAL.
4. Press and release the YES pad. The display should
read CONTAINER READY? If the container is under
the funnel, press YES.
5. The display should read CALIBRATE DILUTE. Press
and release START to begin the dilution flow for
calibration. The display should read CALIBRATE
DILUTE...60 SEC TO FINISH. The 60-second timer
on the display will count down to zero. When the
counter reaches zero, the display will changes to
DILUTE OZ/M, along with a number.
6. Measure the amount of water in the container and
using the (-) and (+) pads, adjust the amount of
the display to match the amount in the container.
Then press DONE.
7. The display should now read NEW DILUTE FLOW,
along with the correct flow rate of the sprayhead.
After about 5 seconds, the display will return to the
CALIBRATE FLOW screen, BREW COUNTERS. To
exit programming, press and release the ON/OFF
button to return to the MAIN SCREEN.
P2880
BREW
A
BREW
B
BREW
C
BREW
A
BREW
B
BREW
C
BREW
A
BREW
B
BREW
C
BREW
A
BREW
B
BREW
C
BREW
A
BREW
B
BREW
C
BREW
A
BREW
B
BREW
C
CALIBRATE FLOW?
NO YES
SPRAY HEAD CAL
NO YES
CALIBRATE FLOW?
NO YES
CONTAINER READY?
QUIT YES
DILUTION CAL?
NO YES
CALIBRATE DILUTE
60 SEC TO FINISH
DILUTE OZ XX.X
(-) DONE (+)
NEW DILUTE FLOW
XX.X OZ/M
PRESSING NO WILL
ADVANCE TO
BREW COUNTERS
5 SEC.
CALIBRATE DILUTE
QUIT START
36748 101505