Vermont Casting DVR33 Ventilation Hood User Manual


 
10002823/0 DVR33 19
Vermont Castings, Majestic Products
VERTICAL THROUGH-THE-ROOF
INSTALLATION
1. Locate your replace.
2. Plumb to centre of the 4" (100 mm) ue collar from the
ceiling above and mark the position.
3. Cut an opening equal to 9-3/8" x 9-3/8" (240 mm x 240
mm).
4. Proceed to plumb for additional openings through the
roof. In all cases, the opening must provide a minimum of
1" (25 mm) clearance to the vent pipe, i.e., the hole must
be at least 9-3/8" x 9-3/8" (240 mm x 240 mm).
5. Place the replace into position and secure it to the oor.
6. Place restop(s) #7DVFS and Attic Insulation Shield
#7DVAIS (if required) into position and secure with
screws or nails. (Fig. 34)
7. Install roof support (Fig. 32) and roof ashing making
sure the upper ange of the ashing is under the shingles.
Fig. 33.
8. Install appropriate pipe sections until the ue is above the
ashing. (See Fig. 33).
9. Install the storm collar and seal around the pipe.
10. Add additional vent lengths to achieve the require termi-
nation height. Fig. 31.
11. Apply high temperature sealant to 4" (100 mm) and 7"
(175 mm) collars of vertical vent termination and install
onto the venting.
If there is a room above ceiling level, restop
spacer must be installed on both the bottom and
the top side of the ceiling joists. If an attic is
above ceiling level a 7DVAIS (Attic Insulation
Shield) must be installed.
The enlarged ends of the vent section always
face downward,
Fig. 34