Dacor PHW Ventilation Hood User Manual


 
10
Carefully put the chimney over the blower assembly,
taking care not to scratch the surfaces. Make sure the
wiring is tucked in behind the chimney.
Lock the tabs inside the chimney bottom into the slots
on the bottom of the blower assembly.
Slide the top of the chimney up toward the ceiling. Line
up the holes on the side of the chimney, near the vents,
with the holes on the side of the chimney mounting
bracket.
Attach the top of the chimney to the mounting bracket
using two sheet metal screws, one on each side.
5.
6.
7.
8.
INSTALLATION INSTRUCTIONS
CHIMNEY
MOUNTING
BRACKET
CHIMNEY
LOCK TABS
ON INSIDE
OF CHIMNEY
INTO SLOTS
ON BLOWER
ASSEMBLY
SLOTS
TABS ON
INSIDE OF
CHIMNEY
Install the Hood
WARNING
Attaching the glass range hood requires two people.
Do not attempt to lift the hood without assistance.
Locate the hood mounting hardware. It consists of:
-
4 thumb screws
- 4 plastic washers
- 4 plastic spacers
For easier hood installation, assemble all the thumb
screw hardware before lifting the hood into position.
Lift the glass hood into place. Line up the holes on the
glass with the mounting holes on the bottom of the
blower assembly.
Insert all four thumb screws into the bottom of the glass
and tighten into place.
1.
2.
3.
4.
Chimney Installation (cont.)
Hold each thumb screw with the threads up.
Put the plastic washer on the thumb screw.
Put the plastic spacer over the end.