Installation electrolux 9
EN
INSTALLATION
Drilling the Ceiling/shelf
• Use a plumb line to mark the centre of
the hob on the ceiling/support shelf.
• Place the drilling template 21 provided
on the ceiling/support shelf, making
sure that the template is in the correct
position by lining up the axes of the
template with those of the hob.
• Mark the centres of the holes in the
template.
• Drill the holes at the points marked:
• for concrete ceilings, drill for plugs
appropriate to the screw size.
• for hollow brick ceilings with wall
thickness of 20 mm: drill ø 10
mm(immediately insert the Dowels
11 supplied).
• for wooden beam ceilings, drill ac-
cording to the wood screws used.
• for wooden shelf, drill ø 7 mm.
• for the power supply cable feed, drill
ø 10 mm.
• for the air outlet (Ducted Version),
drill according to the diameter of the
external air exhaust duct connec-
tion.
• Insert two screws of the following
type, crossing them and leaving 4-5
mm from the ceiling:
• for concrete ceilings, use the appro-
priate plugs for the screw size (not
provided).
• for Cavity ceiling with inner space,
with wall thickness of approx. 20
mm, Screws 12h, supplied.
• for wooden beam ceilings, use 4
wood screws (not provided).
• for wooden shelf, use 4 screws 12g
with washers 22 and nuts 23, pro-
vided.