20 electrolux INSTALLING THE COOKER HOOD
EN
Fitting the Wall Brackets
Wall marking:
• Draw a vertical line on the supporting
wall up to the ceiling, or as high as
practical, at the centre of the area in
which the hood will be installed.
• Draw a horizontal line at 650 mm
above the hob.
• Place bracket 7.2.1 on the wall as
shown about 1-2 mm from the ceiling
or upper limit aligning the centre
(notch) with the vertical reference line.
• Mark the wall at the centres of the
holes in the bracket.
• Place bracket 7.2.1 on the wall as
shown at X mm below the fi rst bracket
(X = height of the upper chimney
section supplied), aligning the centre
(notch) with the vertical line.
• Mark the wall at the centres of the
holes in the bracket.
• Mark a reference point as indicated
at 116 mm from the vertical reference
line and 306 mm above the horizontal
reference line.
11
12a
306
X
116
1÷2
116
650 min.
7.2.1
• Repeat this operation on the other
side.
• Drill ø 8 mm holes at all the centre
points marked.
• Insert the wall plugs (not supplied) in
the holes.
• Fix the lower bracket 7.2.1 using the
two screws (not supplied).
• Fix the upper bracket 7.2.1 and the air
outlet connection support 7.3 together
using the two screws (not supplied).
• Insert the two screws (not supplied)
supplied in the hood body fi xing holes,
leaving a gap of 5-6 mm between the
wall and the head of the screw.
Note: If the hood is to be installed
onto a hollow construction or
plaster or partition board wall
then special fi xing screws will be
required (not supplied).