TEST PROCEDURES
PROCEDURE
LETTER
COMPONENT TEST
H MONITOR SWITCH TEST
SECONDARY INTERLOCK RELAY (RY2)
1. Disconnect the power supply cord, and then remove outer case.
2. Open the door and block it open.
3. Discharge high voltage capacitor.
4. Disconnect two (2) wire leads from the male tab terminals of the Secondary Interlock Relay. Check
the state of the relay contacts using a ohmmeter. The relay contacts should be open. If the relay
contacts are closed, replace the circuit board entirely or the relay itself.
5. Reconnect all leads removed from components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord after the outer case is installed.
8. Run the oven and check all functions.
plate of the oven cavity with the door opened (in this condition the plunger of the monitor switch is
pushed in), the meter should indicate an open circuit. If improper operation is indicated, the switch
may be defective. After testing the monitor switch, reconnect the wire lead to the monitor switch
(COM) terminal and check the continuity of the monitor circuit.
Primary
Interlock Switch
Monitor Switch
Screw Driver
Ohmmeter
Red
White/ White
1. Disconnect the power supply cord, and then remove outer case.
2. Open the door and block it open.
3. Discharge high voltage capacitor.
4. Before performing this test, make sure that the secondary interlock switch and the primary interlock
relay are operating properly, according to the above Switch Test Procedure. Disconnect the wire
lead from the monitor switch (COM) terminal. Check the monitor switch operation by using the
ohmmeter as follows. When the door is open, the meter should indicate a closed circuit. When the
monitor switch actuator is pushed by a screw driver through the lower latch hole on the front plate
of the oven cavity with the door opened (in this condition the plunger of the monitor switch is pushed
in), the meter should indicate an open circuit. If improper operation is indicated, the switch may
be defective. After testing the monitor switch, reconnect the wire lead to the monitor switch (COM)
terminal and check the continuity of the monitor circuit.
5. Reconnect all leads removed from components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord after the outer case is installed.
8. Run the oven and check all functions.
of the oven cavity with the door opened (in this condition the plunger of the monitor switch is pushed
in), the meter should indicate an open circuit. If improper operation is indicated, the switch may
be defective. After testing the monitor switch, reconnect the wire lead to the monitor switch (COM)
terminal and check the continuity of the monitor circuit.
5. Reconnect all leads removed from components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord after the outer case is installed.
8. Run the oven and check all functions.