Electrolux PLHV36W7CC Ventilation Hood User Manual


 
7
Installation
Wiring to Power Supply
WARNING!
ELECTRICAL GROUNDING INSTRUCTIONS
THIS APPLIANCE IS FITTED WITH AN ELECTRICAL JUNCTION BOX WITH
3 WIRES, ONE OF WHICH (GREEN/YELLOW) SERVES TO GROUND THE
APPLIANCE. TO PROTECT YOU AGAINST ELECTRIC SHOCK, THE
GREEN AND YELLOW WIRE MUST BE CONNECTED TO THE GROUNDING
WIRE IN YOUR
HOME ELECTRICAL SYSTEM, AND IT MUST UNDER NO CIRCUMSTANCES
BE CUT OR REMOVED.
Warning: Turn off power circuit at the service panel before wiring this unit.
1. 120 V AC, 15 AMP branch circuit required.
2. Remove the junction box cover, unscrew the 4 screws that fix it to the body of
the hood.
3. Install the conduit connector (1/2") in junction box.
4. Run 3 wires; black, white and green (wire gauge per code) in 1/2" conduit from
service panel to junction box.
5. Connect black wire from service panel to black or red in junction box, white to
white and green to green-yellow.
6. Close junction box cover, with its 4 screws. Check all light bulbs to make sure
they are secure in their sockets. Turn power on in service panel. Check lights
and blower operation per Care & Use section of this manual. Install filters.
7. Install duct cover as shown in Fig. 6.
8. Fit the filters , see Page 9.
Rear discharge:
A 90° elbow may be installed immediately above the hood. For serviceability, a
mounting similar to the straight up discharge shown in Figure 4 should be used.
Figure 5
Figure 6
Junction
Box Cover
fixing screws
1/2 Conduit