Frymaster TB14 Fryer User Manual


 
TB14 SERIES GAS FRYERS
CHAPTER 2: IMPORTANT INFORMATION
2-2
2.4 Pre-Installation (cont.)
2. Frymaster TB14 Series gas fryers require 120VAC 60 cycle or 230VAC single-phase 50-
hertz (International/CE) electrical service and are equipped with a 16-3 SJT grounded
flexible power cord for a direct connection to the power supply. Amperage draw for each
unit depends on the accessories supplied with the unit/system.
B. Clearances: The fryer area must be kept free and clear of all combustibles. This unit is design-
certified for the following installations:
1. Commercial installation only (not for household use).
2. Non-combustible floor installation equipped with factory-supplied 6-inch (15-cm) adjustable
legs or 5-inch (13-cm) casters;
3. Combustible construction with a minimum clearance of 6-inches (15-cm) side and 6-inches
(15-cm) rear, and equipped with factory-supplied 6-inch (15-cm) adjustable legs or 5-inch
(13-cm) casters.
DANGER
Local building codes usually prohibit a fryer with its open tank of hot oil from being
installed beside an open flame of any type, whether a broiler or the open burner of a
range.
C. Installation Standards:
1. U.S. installations must meet: 2. Canadian installations must meet:
American National Standard Institute CAN 1-B149 Installation Codes
ANSI Z83.11 Canadian Gas Association
American Gas Association 55 Scarsdale Road
8501 E. Pleasant Valley Road Don Mills, ONT, M3B 2R3
Cleveland, OH 44131
National Electrical Code Canadian Electric Code c22.1, part 1
ANSI/NFPA #70 Canadian Standards Association
American National Standard Institute 178 Rexdale Blvd.
1430 Broadway Rexdale, ONT, M9W 1R3
New York, NY 10018
NFPA Standards #96 and #211
National Fire Protection Association
470 Atlantic Avenue
Boston, MA 02110