GE Monogram ZXR758 Ventilation Hood User Manual


 
Installation Preparation
3
REQUIRED ACCESSORIES
This book provides step by step instructions to install the
Monogram ZV750 wall mounted hood for recirculating
operation.
• One of the following accessory kits is required for
non-vented wall mounted installations of model ZV750.
Choose the correct kit according to ceiling heights:
ZXR758 – For 8 to 9 ft. ceiling height.
ZXR7510 – For 9 to 10 ft. ceiling height.
• Order the required accessory at the same time as the
vent hood and have on site before installation.
• Each kit includes decorative duct cover, air deflector
and charcoal filters.
PRODUCT DIMENSIONS
The vent hood must be installed 24" min. and 30" max.
above the cooking surface. 25-1/2" is recommended for
best performance and to insure that the duct cover
meets the ceiling. The cooking surface should be at least
36” above the floor. Installation will be easier if the vent
hood is installed before the cooktop and countertop is
installed.
* ZXR758
26-1/4" for 8 ft. Ceiling
38-1/4" for 9 ft. Ceiling
ZXR7510
34-1/4" to 50-1/4" for
9 ft. to 10 ft. Ceiling
* The distance between the cooking surface and the bottom of the
hood must be at least 24” and up to 30” The 25-1/2” recommended
installation height, above the standard 36” countertop, will insure
duct cover fit to the ceiling.
*25-1/2" Recommended
36" Min.
*Height
to Ceiling
8-1/4"
34-5/8"
21-5/8"