Assemble
10 309521J
FIG. 3
B
Key:
A Pump A Air
B Pump B Air
C Pump A Pilot Air
D Pump B Pilot Air
E Air Supply
F Metering Valve A - CLOSE
G Metering Valve A - OPEN
H Metering Valve B- CLOSE
J Metering Valve B- OPEN
K Sensor A Cable
L Sensor B Cable
2Pump
3 Pneumatic Control
6 Metering Valve Manifold
501 Pneumatic Valve
901 Air Filter
902 Ground Wire Assembly
Ground manifold to true earth ground.
Ground by connecting ground wire from control box (3) to
manifold (6).
Ground by connecting ground wire from pumps (2) to
manifold (6).
1
2
3
A
C
D
E
F
G
H
J
K
L
6
3
2
1
33
2
501
901
5
902