Hobart D Series Refrigerator User Manual


 
–2–
© HOBART CORPORATION, 1991
D Series Reach-In Refrigerators & Freezers
INSTALLATION
UNPACKING
Immediately after unpacking the reach-in, check for possible shipping damage. If this unit is found to
be damaged after unpacking, save the packaging material and contact the carrier within 15 days of
delivery.
Prior to installation, test the electrical service to assure that it agrees with the specifications on the
machine data plate located on the upper left side wall inside the cabinet.
LOCATION
For optimum performance, the condensing unit of the reach-in must have an adequate supply of air for
cooling purposes. The operating location must provide either a minimum 12
"
clearance overhead of the
condensing unit or the unrestricted flow of air at the back of the reach-in.
Installation, Operation and Care of
D SERIES REACH-IN REFRIGERATORS & FREEZERS
SAVE THESE INSTRUCTIONS
GENERAL
D Series Reach-In Refrigerators (38°F) and Freezers (0°F) may be ordered as one-, two-, or three-
section cabinets. Doors may be full height or half height solid with stainless exterior surface and ABS
plastic interior surface. Glass doors, full height or half height, are available for
refrigerators only. High
Capacity refrigeration systems are included with glass door units. Legs or 5" casters are available. The
exterior sides and the interior of the D Series cabinet are DuraFinish
TM
aluminum.