IBM AIX5L Frozen Dessert Maker User Manual


 
20 CATIA and Enova migration AIX 4.3 to AIX 5L Version 5.1
Figure 4-3 Accept new license agreement checkmark
The entire migration process is left out of this document. We assume that you have the
appropriated skills to run a migration installation. If not, we recommend that you read the
documentation previously cited.
Starting the migration over is not a very complex process. You have to choose the rte - Install
from installation images panel and select the appropriate lpp_source and SPOT for AIX 5L
Version 5.1. After the client was rebooted the installation main menu appears (if you have not
decided to use a bosinst.data resource for an unattended installation). You can go through
that menu and then the migration confirmation menu appears. Press Enter to continue and
you can leave the migration alone.
The duration of the migration process depends on the software installed on the system and
the hardware type. For example, a migration on a POWER3 hardware is faster than on a
PowerPC 604.