Cornelius 000 PLUS Refrigerator User Manual


 
5 300614000
INSTALLATION
This section covers unpacking and inspection, selecting location, installing the Cooling Unit and the Remote
Condenser Coil and Fan Assembly preparing for operation, and operation.
UNPACKING AND INSPECTION
NOTE: The Cooling Unit and the Remote Condenser Coil and Fan Assembly were thoroughly inspected
before leaving the factory and the carrier has accepted and signed for them. Any damage or
irregularities should be noted at time of delivery (or not later than 15 days from date of delivery) and
immediately reported to the delivering carrier. Request a written inspection report from Claims
Inspector to substantiate any necessary claim. File claim with the delivering carrier, not with IMI
Cornelius Inc.
1. After Cooling Unit has been unpacked, remove shipping tape and other packing material.
2. Unpack LOOSE-SHIPPED PARTS. Make sure all items are present and in good condition.
Table 2. Loose-Shipped Parts
Item
No. Part No. Name Qty.
1 309852000 Tubing Clamp 24
2 770407 Barbed Connector, 1/4 by 3/8 12
3 770424 Barbed Connector, 1/2 by 1/2 2
4 311962000 Label, Line Identification 1
NOTE: The following Remote Condenser Coil and Fan Assembly and Refrigeration Line Kits are rec-
ommended for use with Cooling Unit (P/N 416654000). Refrigeration Lines Kit (as ordered) is used to
connect Condenser Coil and Fan Assembly to the Cooling Unit.
5 309602000 Remote Condenser Coil and Fan Assy 1
6 300598025 Refrigeration Line Kit, 25-ft. long, 90 1
300598050 Refrigeration Line Kit, 50-ft. long, 90 1
IDENTIFICATION OF LOOSE-SHIPPED PARTS
1. BARBED CONNECTORS (item 2) used to connect Cooling Unit outlet lines to insulated python lines.
Connections are secured with TUBING CLAMPS (item 1).
2. BARBED CONNECTORS (item 3) are used to connect Cooling Unit outlet carbonated water lines to
insulated python lines.
3. LABEL, LINE IDENTIFICATION (item 4) to be installed on Cooling Unit and syrup flavors to be recorded in
proper spaces on label.
4. REFRIGERATION LINE KIT (items 6) is used to connect REMOTE CONDENSER COIL AND FAN ASSY
(item 5) to Cooling Unit.
SELECTING LOCATION
COOLING UNIT
Select location for Cooling Unit installation that will (1) Allow the shortest possible insulated python route from
the Cooling Unit to the Dispensing Station location; (2) Allow the shortest possible refrigeration lines (not to
exceed 50-ft in length) route from Remote Condenser Coil and Fan Assembly to the Cooling Unit; (3) REFER
TO THE COOLING UNIT NAMEPLATE FOR THE REQUIRED POWER CIRCUIT OPERATING VOLTAGE, HZ,
AND THE MINIMUM CIRCUIT AMPACITY OF THE COOLING UNIT. The power circuit for the Cooling Unit
must be wired through a 40-amp minimum rated disconnect switch (not provided) and the power circuit must be