Pitco Frialator and RSE14 Pasta Maker User Manual


 
1-3
1.3 INSTALLATION
Although the cooker is easy to install and set up, it is STRONGLY recommended that this installation
be done by qualified professionals. The professionals that install the new cooker will know the local
building codes and ensure that the installation is safe.
NOTICE
Proper connection to electric, water, and drainage services is essential for safe,
efficient, and trouble free operation of the Pasta Perfect cooker.
1.3.1 Installation Clearances
The cooker needs clearance around it for proper operation. Adequate clearances allow for proper
burner operation and servicing. The clearances shown below are for cooker installation in both
combustible and noncombustible enclosures.
Combustible Non-Combustible
Construction Construction
Back 6" 0"
Sides 6" 0"
Floor 6" 6"
1.3.2 Plumbing Connections
The plumbing installation must be done by a licensed plumber and must comply with local and
national codes.
1.3.2.1 Water Inlet Connections (Pasta Perfect units) - The rinsing/holding unit is equipped with
a faucet type fill system. Make water connections to the faucets through the rear access panel of rear
tank riser.
NOTICE
If cold water only is used to fill the cooker, it will require at least twenty (60) minutes
to bring the water up to cooking temperature.
1.3.2.2 Drainage Connections - Both the cooking/warming section and the rinsing/holding
section are equipped with drainage connections. The main drainage connection is located at the front
bottom point of the cooker and is equipped with a 1-1/4" stainless steel valve. The overflow drain
is located underneath the front deck of the cooker. The overflow hose is connected at the factory and
is ready for installation.