Southbend SLGB/25SC Oven User Manual


 
M
ARATHONER
G
OLD
& S
ILVER
S
TAR
G
AS
C
ONVECTION
O
VENS
I
NSTALLATION
O
PERATOR
S
M
ANUAL
1181887
REV
1P
AGE
19
INSTALLATION
Step 6: Installation of Optional Open Rack Storage
An option for single-deck Marathoner Gold ovens is to have open rack storage below the oven. The
following describes how to assemble this option. All holes are pre-drilled for the screws provided.
1. Attach the legs to the oven as described in installation Step 2b on page 11.
2. Attach the two frame hangers (items “A” in the following drawing). The flanged side of each rack
hanger must be on the side of the hanger closest to the edge of the oven.