Vulcan-Hart K20ELT ML-136077 K40ELT ML-136078 K60ELT ML-136079 Hot Beverage Maker User Manual


 
10. Remove air from reservoir jacket as outlined
under VENTING.
11. Check for proper operation.
POTENTIOMETER
Disconnect the
electrical power to the machine and
follow lockout / tagout procedures.
1. Remove CONTROL BOX COVER.
2. Disconnect potentiometer wire from temperature
control.
3. Pull temperature dial from potentiometer shaft
and remove seal nut.
Fig. 19
4. Remove potentiometer from control panel.
5. Reverse procedure to install and check for proper
operation.
NOTE: When installing, ensure potentiometer
alignment tab is seated in positioning bracket.
Fig. 20
SWITCH ASSEMBLY
Disconnect the
electrical power to the machine and
follow lockout / tagout procedures.
1. Remove
CONTROL BOX COVER.
2. Note lead wire location and disconnect wires
from switch.
3. Press down on tabs to free switch from housing.
Fig. 21
4. Reverse procedure to install.
Electric Stationary and Tilting Kettles - REMOVAL AND REPLACEMENT OF PARTS