CONNECT DUCTWORK
U
se the screws and wall anchors provided to
secure the upper brackets to the ceiling.
Position the upper brackets based on the
d
imension of the telescopic chimney flue.
Use an 8" (203) round metal duct to connect
the duct collar on the hood to the ductwork
above. Use duct tape to make all joints secure
and air tight.
Connect the upper section of the telescopic
chimney flue to the brackets with the screws
provided.
Nest the bottom of the telescopic chimney flue
into the relief in the hood shell.
8
WOLF COOKTOP VENTILATION HOODS
WALL HOOD INSTALLATION
ELECTRICAL CONNECTIONS
I
MPORTANT NOTE:
T
his ventilation hood
must be properly grounded. This unit should
be installed by a qualified electrician in accord-
a
nce with all applicable national and local
electrical codes.
Remove the cover from the rear electrical box.
Remove the electrical box knockout that faces
the hood's discharge collar.
Insert 6" (152) of 120 V AC power cable through
the knockout opening. Secure the cable to the
electrical box with an appropriate connector.
Make electrical connections. Connect black to
black, white to white and green/yellow to
green or bare wire. Refer to the illustration
below.
Reinstall the electrical box cover and screws.
Make sure that all wires are secure and that no
wires are pinched between the cover and box.
Refer to page 13 for internal blower installation
guidelines and remote blower wiring.
IMPORTANT
NOTE
You must follow
all National
Electrical Code
regulations. In
addition, be aware
of local codes and
ordinances when
installing your
service.
green/yellow to
green or
bare wire
black to
black
HOOD FRONT TOP OF HOOD SHELL
discharge
collar
120 V AC
power cable
rear
electrical
box
white
to white
Upper
Brackets
Fasten upper brackets to ceiling and wall
with screws (and anchors if necessary)
Electrical connections Upper bracket installation
Screws
Fasten flue to hood and upper brackets
and nest flue in hood relief
T
elescopic chimney flue installation