Zephyr CTP-E 60SX Ventilation Hood User Manual


 
Installation - M ounting the Hood
14
Utensil Rail Installation
1. Attach utensil rail to long side of hood canopy
. A small hole has been pre-drilled into the canopy to provide a
starting point to attach the rst utensil rail post. After the rst post is line up with the hole, gently slide the rest
of the rail onto canopy. (note: be careful not to scratc h the stainless steel when per forming this step, this is
why there is a star ter hole).
2. Attach a short set screw into each post in order to hold utensil rail onto canopy. Do the same for the other side.
caBtnorFk
Telescopic Rod Installation
1. Install telescopic rod (thicker end down) into coupler
on top of hood and secure with medium set screw.
Attach screw using provided tool.
2. Extend telescopic rod towards the ceiling and
insert thin end of rod into ceiling coupler. Attach
a medium set screw in the middle where the
two rods attach to each other.
3. Attach medium set screw into the ceiling coupler
to secure it in place. Repeat these steps for each
telescopic rod.
Set
screws
Set
screw
Tool
www.zephyronline.com