Zephyr ZGE-E30AS Ventilation Hood User Manual


 
10
www.zephyronline.com
Installation – Installing the Hood
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
!
1) Prepare electrical wiring and ducting in cabinet. Location of junction box and blower outlet can be found on page 8.
2) Unscrew the (10) screws from front panel and place
the panel aside, Fig.3. You will now have access to the
interrior of the range hood.
Fig.3 Fig.4
3) Open cabinet doors. Lift range hood and slide it through
the opening located in the bottom of the cabinet, Fig.4.
Make sure opening matches the dimensions on page 9,
Fig.1.
4) There are spring clips located on the left and right sides
of the hood body which will temporarily hold the hood in
place, Fig.5.
Fig.5 Fig.6
5) Secure upper brackets to left and right sides of hood
body by using (2) 3/16 x 3/8” screws for each bracket.
Fig.6. Make sure the (2) captive nut screw holes on
the bracket are facing downward. Note: Due to limited
workspace in 30” cabinets you will need to use a right
angle or 2” long Philips head screwdriver.
1
2