Zephyr ZGE-E30AS Ventilation Hood User Manual


 
Installation – Installing the Hood
12
www.zephyronline.com
A
10) Place 6” round ducting over blower collar and secure
with aluminum duct tape. If using hood in ductless
recirculating mode turn to page 13.
Install electrical wiring. Note: A cable lock (not
included) may be required by local codes. Check
with local requirements and codes, purchase and install
appropriate connector if necessary.
Make sure no packing material is inside hood. Power
up hood check for leaks around duct tape and verify all
functions.
Fig.11 Fig.12A
11) Secure (2) 1” wood screws (A) into the screw holes on
the left and right sides of the fi lter opening. This will secure
the hood body to the cabinet base and prevent the hood
from shifting after installation.
Fig.12B
12) Place front panel back on hood body and secure in
place by using the (10) screws previously removed from
step 2.