APW Wyott AT/BT Series Toaster User Manual


 
4
2. ASSEMBLY (REFER TO ILLUSTRATIONS ABOVE)
a) Lay the toaster on its side and install the four Adjustable Legs (Item 1) in threaded holes in
base. Tighten legs with crescent wrench. The unit may be leveled by unscrewing the lower
insert of each leg. Precise leveling is not required for proper operation of the toaster. Set the
toaster upright.
CAUTION: DO NOT OPERATE THE TOASTER WITHOUT THE LEGS INSTALLED.
3. CONVEYOR INSTALLATION
M-83 Only:
Remove Butter Roller (Item 2) by pushing shaft to the left to disengage. Remove Butter Pan (Item 3)
by lifting the pan up and off the supporting pins.
M-83/M-83D:
a) Remove Top Front Panel (Item 4A) by gripping the two black knobs while lifting up and
slightly back. The Bottom Front Panel (Item 4B) can then be removed by grasping the top
edge with one hand and pulling straight back. Hold the bottom with the other hand and lift up
and toward the front; then slide panel down and out underneath the Butter Roller bushings.
b) Grasp Conveyor (Item 5) by the handles. Lower conveyor knobs into right and left Hangar
Brackets (Item 6A/B). Gently push forward to engage gears.
CAUTION: THE CONVEYOR IS HEAVY. DO NOT DROP INTO POSITION. DROPPING
MAY CAUSE DAMAGE TO GEARS.
c) Replace Bottom Front Panel (Item 4B), Top Front Panel (Item 4A), Butter Pan (Item :3) and
Butter Roller (Item 2)
M-91 :
a) The Conveyor (Item 5) is shipped in place and strapped down with nylon tie. To remove
nylon tie, follow steps b, c and d. .
b) Remove Butter Roller (Item 2) by pushing shaft to the right to disengage. Remove Butter
Pan (Item 3) by sliding toward the front of the unit, underneath the Butter Roller Bushings.
c) Remove Front Panel (Item 4) by gripping the top edge with one hand and the bottom edge
with the other hand. Lift up to disengage slots in panel from retaining rods, then move
forward and slide down and out underneath the Butter Roller Bushings.
d) Cut and remove the nylon tie securing the conveyor. (Note: To remove for cleaning, see
"Disassembly" Instructions.)
e) Replace Front Panel (Item 4), Butter Pan (Item 3) and Butter Roller (Item 2).
M-95
a) The Conveyor (Item 5) is shipped in place and strapped down with nylon tie. To remove
nylon tie, follow steps b, c, and d.
b) Remove Butter Roller (Item 2) by lifting left side of butter roller shaft. Remove Butter Pan by
sliding toward the front of the unit, underneath the butter roller bushings.
1
1
1
2
2
2
3
3
3
4A
4A
4B
5
5
5
6B
6A