- 1 -
RECEIVING YOUR NEW MODEL
Congratulations on your recent purchase of Bally refrigerator superior food
equipment products! When your shipment arrives, please thoroughly examine the
shipping crate for any punctures, dents, or signs of rough handling. It is in your best
interest to partially remove or open the shipping container in order to examine the
model for any concealed damages which may have occurred during shipment. If
the model is damaged, it must be noted on the delivering carrier's delivery slip or bill
of lading (see "filing a damage claim" under warranty section).
GENERAL INFORMATION AND IMPORTANT OPERATING FACTS
This manual has been compiled to aid in the installation, operation and
maintenance of your new equipment. Please take the time to read all of the material
in order to become more familiar with your equipment and its operation, and enjoy
optimum performance.
Important Note: All value and designer line freezers have an energy-saving fan
delay control to prevent the interior fans from operating until the evaporator coil
becomes chilled. Therefore, on initial start-up, the fans will not turn on immediately.
This is a normal mode of operation. Allow sufficient time for the evaporator coil to
reach its operating temperature (approximately 20 minutes).
No floor drains or plumbing connections are required since all models are
completely self-defrosting and use an automatic defrost condensate water
evaporating system (see "condensate evaporator installation" under installation and
location section).
All cabinets must be given sufficient time to reach normal operating temperature
before placing any food inside. For refrigerators, approximately 2 hours of operation
are required to lower the cabinet temperature to 40 degrees f. Freezers require
approximately 4 hours of operation to lower the cabinet temperature to 0 degrees f
(see "operation" section for further information).
Never overload top shelf with product so as to block or restrict cabinet airflow.
Doing so will result in poor performance, decrease in efficiency and possible need
for service to de-ice evaporator.
Prior to factory shipping, all models are performance run tested for a minimum of 12
hours providing a highly sophisticated temperature analysis recording exclusive to
each individual cabinet. This recording is supplied within this manual packet. A final
leak check, vibration, noise level and visual examination is made by a qualified
quality control team to assure a quality product. The carrier signs to this effect when
he accepts the product for shipping. To insure the maximum in safety and
sanitation, all models are listed under the reexamination service of underwriter's
laboratories and with the national sanitation foundation.