Bunn Dual TF DBC Coffeemaker User Manual


 
Page 7
INITIAL SETUP
CAUTION – The brewer must be disconnected from the power source throughout the initial setup, except when
specified in the instructions.
1. Insert an empty funnel into the funnel rails of one of the brew stations.
2. Place an empty server under the funnel.
3. Connect the brewer to the power source. Water will begin flowing into the tank and stop when the tank is filled
to its capacity. Display will show PLEASE WAIT...TANK FILLING until tank is filled with water.
4. Wait approximately twenty minutes for the water in the tank to heat to the proper temperature. Display will show
READY TO BREW...WATER TEMP: XXX˚ when tank is at operating temperature.
5. Place a small vessel beneath the faucet and open the faucet handle. Release it when you hear the tank refilling.
6. Water volumes have been preset at the factory. Refer to adjustments for the
Set Brew Volumes
section of this
manual should the volume need to be increased or decreased.
7. The brewer is now ready for use in accordance with the coffee brewing instructions.
COFFEE BREWING
1. Select the desired batch size on the grinder. It is not necessary to select a size on the brewer.
2. Insert a BUNN
®
filter into the funnel.
3. Grind the selected amount of fresh coffee into the Smart Funnel
®
using the G9-2T DBC with Smart Funnel
®
operation and level the grounds by gently shaking.
4. Slide the funnel into the funnel rails. The brewer will read the size ground through the chip in the funnel handle
and will automatically select the correct size to brew. If the grounds are not obtained through a grinder
compatible with a Smart Funnel
®
, a batch size must be chosen on the brewer.
5. Place an empty server under the funnel.
6 The must be ON. Momentarily press and release the pad. If the brewer has the funnel lock option
and if it is activated, once a brew cycle has been started the funnel is locked in place. There may be certain
situations in which the brew cycle will not begin when is pressed:
a) ON/OFF must be ON.
b) BREW TEMPERATURE TOO LOW - wait until heated or cancel BREW LOCKOUT option. (Page 10)
c) FUNNEL NOT IN PLACE (or using a standard brew funnel) - cancel FUNNEL DETECT. (Page 31)
d) CHECK FUNNEL - remove funnel, empty previously brewed grounds and grind a new batch into the funnel.
7. If none of the above messages are displayed, the display will read NOW BREWING and the time remaining in
the brew cycle. Arrows will point to the side which is brewing. If both sides are brewing simultaneously, the
arrows will alternate from left to right on the display.
8. Following the BREW will be a countdown of drip time DRIPPING which shows the time remaining until the
funnel lock will release. Discard the grounds and filter only after visible dripping stops.
CLEANING
1. The use of a damp cloth rinsed in any mild, nonabrasive, liquid detergent is recommended for cleaning all
surfaces on Bunn-O-Matic equipment.
2. Check and clean the sprayhead. The sprayhead holes must always remain open.
NOTE – In hard water areas, this may need to be done daily. It will help prevent liming problems in the brewer and
takes less than a minute.
35058 121102