Page 11
TOO HOT-WILL
COOL TANK NOW
ACCURACY RISK!!!
OK CAL.
CALIBRATE NOW?
NO YES
PLACE BREWER IN
FINAL LOCATION
ENABLE BrewLOGIC
NO DONE YES
PROGRAMMING FUNCTIONS - LEVEL 2 (cont.)
ADJUSTMENTS & OPTIONAL SETTINGS (CONT.)
The BrewLogic system allows the brewer to be calibrated to
high mineral locations and compensate as deposits build up
internally. Press YES, then press DONE. Follow the prompts.
Pertains only to software version 1.07 & above!
Select a sturdy, level location.
Brewer must not be bumped during calibration!
Select YES for calibration. Selecting NO warns of accuracy
risk
Select CAL. to start calibration procedure. Selecting OK will
skip to level probe calibration screen.
Automatically checks to see if tank temperature is between
130°-170°F (54°-76°C)
Go to
SPRAY OZ/M:
Go to CAL
LP1-LP2
PRESS BREW WHEN
CONTAINER READY
Verify brew funnel and decanter/airpot/thermal server (depend-
ing on which model you have) are in place. Then press the
"BREW START" button.
COOLING TANK
PLEASE WAIT
Message will be displayed while dispense is being performed.
Tank heaters are turned off and the unit will dispense for ~1
minute to cool tank temperature.
(CONT.)
41154 041708