L. Installation Check List
Table 2-4 Installation Check List
TASK REFERENCE COMPLETED
(Page Number)
Preparation
• Check Operating Location Clearances 3-4
• Test Supply Water Quality 7
• Verify Electric Power Requirements. 9
• Verify Gas Supply Requirements 6
• Verify Exhaust Hood Requirements 4
Installation
• Verify SteamChef is Level 5
• Check Exhaust Hood Function 4
• Check Electrical Supply Connection 9
• Check Water Supply Connection 8
• Leak Test Water Supply Lines 9
• Check Gas Supply Connection 7
• Leak Test Gas Supply Connection 7
• Check Drain Line Connection 10
Notes: