L. Installation Check List
Table 2-4 Installation Check List
TASK REFERENCE COMPLETED
(Page Number)
Preparation
Check Operating Location Clearances 3-4
Test Supply Water Quality 7
Verify Electric Power Requirements. 9
Verify Gas Supply Requirements 6
Verify Exhaust Hood Requirements 4
Installation
Verify SteamChef is Level 5
Check Exhaust Hood Function 4
Check Electrical Supply Connection 9
Check Water Supply Connection 8
Leak Test Water Supply Lines 9
Check Gas Supply Connection 7
Leak Test Gas Supply Connection 7
Check Drain Line Connection 10
Notes: