ENGLISH
Description of parts:
FIG. 01
1 Main switch
2 Coffee dispensing button-1 strong/2 weak
3 Coffee dispensing button-1 weak/2 weak
4 Hot water supply button
5 Steam supply light
6 Dose programming/Manual dispensing
button
7 Correct temperature light
8 Turbo frother steam nozzle (removeable)
9 Filterholder
10 1 cup filter (or coffee pod)
11 2 cup filter
12 Basin (removable)
13 “Perfect crema” device (OPTION)
14 Brewing head
15 Filterholder gasket
16 Shower disc holder
17 Shower disc
18 Tamper
19 Power cable and plug
20 Measuring spoon
21 Delivery spout
22 Tank cover
23 Grid (removable)
24 Cappuccino maker kit (OPTION)
25 Steam/hot water knob
26 Removable water tank
27 Overflowing protection hole
28 Anti-fingerprint cleaner for stainless steel
29 Level indicator for the basin
Instructions for the power supply cord
A A short power-supply cord is provided to
reduce risks of getting tangled up or tripping
over a longer cord.
B Longer extension cords are available and
may be used if care is exercised in their
use.
C If a long extension cord is used:
1 the marked electrical rating of the extension
cord should be at least as great as the electri-
cal rating of the appliance.
2 if the appliance is of the grounded type, the
extension cord should be a grounding type
3 the cable does not hang from the table to
avoid the risk of getting caught up in it.
Preparation:
1. Remove the water tank cover (22) and fill
with cold water to the MAX line indicated
on tank (26). See FIG. 2.
N.B.: Near the word MAX on the tank there is
the overflowing safety hole (27) in case of
tank overfilling.
The water tank can also be removed, after
removing the tank cover (22) using the
handle.
Re-install tank with water and cover (22).
2. Insert plug (19) into a suitable wall outlet (see
point 1 under “Caution”).
3 Push the main switch (1). The temperature
light (7) will flash until the temperature is
reached; when the temperature is reached
the light will remain on.
The lights of buttons 2 - 3 - 5 - 6 will remain
on in a fixed way (stand-by mode).
Starting up
This procedure fills the water boiler with fresh
water.
This should be done whenever the machine is
switched on.
This machine, featuring a pump to brew coffee,
is equipped with a self-priming system.
Put an empty cup below the steam frother (8),
press the hot water button (4) and turn the steam
knob (25) clockwise.
You will hear the noise of the enabled pump
and after a few seconds water will come down
from steam rod (8).
When the cup is filled close the steam knob (25)
and press the hot water button (4) again.
The Gaggia machine is now ready to be
used.
• 9 •