– 4 –
PL-40920-1
FRONT RACK TRACK
AND SPLASH GUARD
SCREWS
INSTALLATION
UNPACKING
Immediately after unpacking the dishwasher, check it for possible shipping damage. If this machine
is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery.
Prior to installation, verify that the electrical service agrees with the specifications on the machine data
plate which is located to the right of the control box.
LOCATION
Before finalizing machine location, make sure that consideration has been given for water supply, drain
connection, electrical conduit, tabling, chemical containers and supply lines, as well as adequate
clearance for opening the doors. A hood or vent may be required in order to meet local codes.
LEVELING
The dishwasher must be level before any connections are made. With the dishwasher in its operating
location, turn the threaded feet as required to level the machine front-to-back and side-to-side.
CONVERTING FROM STRAIGHT-THROUGH TO CORNER OPERATION
The LT1 is shipped from the factory for straight-
through operation. To convert to corner operation,
move the rack track and splash guard as follows:
1. Remove the two screws and nuts that secure
the front rack track and splash guard (Fig. 1)
and remove the front rack track and splash
guard. Reassemble the front rack track and
splash guard by replacing the two screws and
nuts in the same mounting holes from which
they were removed.
2. Remove the two screws and nuts at the outer edges of the splash guard (Fig. 2).
3. With the two screws and nuts removed in step 2, reattach the front rack track and splash guard to
the left side of the rack track assembly, using the mounting holes (Fig. 3) provided.
Fig. 2 Fig. 3
Fig. 1
PL-40920-2
SCREWS
PL-40921-1
MOUNTING HOLES