Lennox International Inc. Gas-Fired Hot Water Boiler Water Dispenser User Manual


 
54
INSTALLATION AND CHECK-OUT CERTIFICATE
Boiler Model Serial # Date Installed___________
Measured BTU/HR input____________
Installation instructions have been followed
Checkout procedure and adjustments performed
Maintenance and Service issues reviewed with owner/ maintenance person
Installation booklet af xed on or adjacent to boiler
Installer (Company)
Address
Phone
Installer’s Name
Signature
INSTALLATION AND CHECK-OUT CERTIFICATE