Sanyo MDF-C8V Freezer User Manual


 
45
12
INSTALLATION
1. Removing the packaging materials and tapes
Remove all transportation packaging materials and tapes. Open the doors and ventilate the unit. If the
outside panels are dirty, clean them with a diluted neutral dishwashing detergent. (Undiluted detergent
can damage the plastic components. For the dilution, refer to the instruction of the detergent.) After
the cleaning with the diluted detergent, always wipe it off with a wet cloth. Then wipe off the panels with
a dry cloth.
2. Adjusting the leveling foot
Extend the leveling feet by rotating them counterclockwise
to contact them to the floor. Ensure the unit is level and
the casters are not in contact with the floor.
3. Fixing the unit
A fixture is attached to the rear of the frame. Fix the
frame to the wall with this fixture and rope or chain.
4. Ground (earth)
The ground (earth) is for preventing the electric shock in the case of the electrical insulation is somehow
degraded. Always ground the unit at the time of installation.
WARNING
Use a power supply outlet with ground (earth) to prevent electric shock. If the power supply outlet is
not grounded, it is necessary to install a ground by qualified engineers.
Never ground the unit through a gas pipe, water main, telephone line or lightning rod. Such
grounding may cause electric shock in the case of an incomplete circuit.
Leveling foot