Sennheiser EW 300 IEM G2 Yogurt Maker User Manual


 
50
To mount two transmitters into a rack:
̈ Place the two transmitters side by side onto a flat
surface, their bottom sides facing upwards.
̈ Align the connecting plate Ƽ over the holes in the
bottom sides of the transmitters.
̈ Secure the connecting plate Ƽ using eight of the
supplied recessed head screws (M 3x6).
̈ Hook the two rack mount “ears” ƺ to the front panels
of the transmitters.
̈ Secure the rack mount “ears” to the transmitters
using two of the supplied recessed head screws
(M 3x6) respectively.
̈ Slide the transmitters into the 19” rack.
̈ Secure the rack mount “ears” to the rack.
When mounting only one transmitter into a rack, use the
connecting bar ƻ instead of the second transmitter.
̈ Hook the two rack mount “ears” ƺ to the front panels
of the transmitter.
̈ Secure the rack mount “ears” to the transmitter using
two of the supplied recessed head screws (M 3x6)
respectively.
̈ Secure the connecting bar ƻ to one of the rack mount
“ears” ƺ using two of the supplied recessed head
screws (M 6x10).
̈ If you are not front mounting the antennas, insert the
two covering plugs ƽ into the antenna holes of the
connecting bar.
̈ Slide the transmitter into the 19” rack.
̈ Secure the rack mount “ears” to the rack.
To mount the transmitter’s antenna connection to the
front of the GA 2 rack adapter using the AM 2 antenna
mount:
̈ Screw the BNC socket ƾ of the BNC extension cables
to the connecting bar ƻ using the supplied plain
washer and nut.
̈ Connect the BNC connector ƿ to the BNC socket Ƹ at
the rear of the transmitter.
̈ Slide the transmitter into the 19” rack.
̈ Secure the rack mount “ears” to the rack.
̈ Connect the telescopic antenna ƹ to the BNC
socket ƾ.
̈ Pull the end cap to extend the telescopic antenna.
ƺ
ƺ
Ƽ
ƻ
ƺ
ƺ
ƽ
ƾ
ƻ
ƹ
ƿ