2.2 SHIPMENT AND TRANSIT
The freezer has been assembled, operated and
inspected at the factory. Upon arrival at the final
destination, the freezer must be checked for any damage
that may have occurred during transit.
With the method of packaging used, the freezer should
arrive in excellent condition. THE CARRIER IS
RESPONSIBLE FOR ALL DAMAGE IN TRANSIT,
WHETHER VISIBLE OR CONCEALED. Do not pay the
freight bill until the freezer has been checked for damage.
Have the carrier note any visible damage on the freight
bill. If concealed damage and/or shortage are found
later, advise the carrier within 10 days and request
inspection. The customer must place claim for damages
and /or shortages in shipment with the carrier. Stoelting,
Inc. cannot make any claims against the carrier.
2.3 FREEZER INSTALLATION
CAUTION
FAILURE TO INSTALL THE FREEZER WITHIN
RECOMMENDED LIMITS WILL RESULT IN
POOR PERFORMANCE OF THE SYSTEM,
PREMATURE COMPONENT FAILURE AND
CANCELLATION OF WARRANTY.
Installation of the freezer involves moving the unit close
to its permanent location, removing all protective
packaging, setting in place and cleaning.
CAUTION
REMOVE LOWER FRONT PANEL BEFORE
REMOVING FREEZER FROM SKID.
A. The freezer requires adequate ventilation. A minimum
of 3” (7.6 cm) of vent space is required for free flow
of cooling air at the front and back (Fig. 4).
NOTE
For Air Cooled Unit Only.
A rear block-off panel has been provided to prevent
recirculation of hot air beneath the freezer. The rear
block-off panel maximizes the efficiency of the freezer.
See the illustration for the installation instructions.
1. Remove both back panel mounting screws below
the bottom most louver.
2. Attach rear block-off panel to the back panel using
the same screws as shown.
Figure 4. Space and Ventilation Requirements
A water-cooled freezer requires an adequate water
supply, install 3/8 inch pipe or ½ inch inside diameter
copper water line to each side of the freezer. Connect
water outlet to a drain using a ½ inch inside diameter
line. Automatic washer hoses work well for final
connections. All water connections must comply with
local codes.
CAUTION
FLUSH ALL WATER LINES BEFORE
INSTALLATION. IN NEW STORES WITH
SEDIMENT WATER, ADD SUITABLE FILTER
OR STRAINER TO WATER INLET.
CAUTION
FAILURE TO PROVIDE ADEQUATE
VENTILATION WILL VOID WARRANTY.
B. The unit is shipped without casters installed. To install
the casters, lift and support the unit while screwing
the four casters into the bottom of the frame at each
corner.
Bottom Most Louver Of Back Panel
Back Panel Mounting Screw
Rear Blockoff Panel
ÅÅ
ÅÅ
Å
ÅÅ
ÅÅ
Å
ÇÇ
ÇÇ
Ç