23
Model C712 Operating Procedures
Step 10
To assemble the freezer door, place the door
gaskets into the grooves on the back of the freezer
door.
Figure 37
Slide the front bearings over the baffle rods. The
flanged edges should be against the door. DO NOT
lubricate the gaskets or front bearings.
Slide the two o-rings into the grooves on each prime
plug. Apply an even coat of Taylor Lube to the
o-rings and shafts.
Figure 38
Step 11
Insert the prime plugs into the holes in the top of the
freezer door, and push down.
Figure 39
Step 12
To install the freezer door, insert the baffle rods
through the beaters in the freezing cylinders.
Figure 40
With the door seated on the freezer studs, install the
handscrews. Use the long handscrews on the top
and the short handscrews on the bottom. Tighten
them equally in a criss-cross pattern to insure the
door is snug.