U-Line CLR60 Ice Maker User Manual


 
5
DRAIN INSTALLATION
PLEASE READ all instructions completely before attempting
to install or operate the unit. All Ice Makers require a con-
nection to the water supply and improper hook-up can
result in substantial property damage! All water and drain
connections MUST BE made by a licensed/qualified plumb-
ing contractor. Failure to follow recommendations and
instructions may result in damage and/or harm.
Plumbing installation must observe all state and local
codes. All water and drain connections MUST BE made by
a licensed/qualified plumbing contractor. Failure to follow
recommendations and instructions may result in damage
and/or harm.
The CLR60 can be installed using a gravity drain or can use a factory
installed or equivalent drain pump.
Follow these guidelines when installing drain lines to prevent water from
flowing back into the ice maker storage bin and/or potentially flowing
onto the floor causing water damage:
Gravity Drain
Drain lines must have a 5/8 inch inside diameter.
• Drain lines must have a 1 inch drop per 48 inches of run (1/4 inch
per foot) and must not create traps.
The floor drain must be large enough to accommodate drainage
from all drains.
Insulate the bin drain line to prevent condensation.
CLR60 With Factory Installed Drain Pump
NOTE
Before installing your U-Line CLR60 With Factory Installed
Pump, it is extremely important to check and test all hose
connections at the drain pump There is a possibility that
hose connections may have loosened during shipment.
!
CAUTION