— 7 —
Fig. 5 Fig. 6
5. Line up holes on top brackets. Attach self-tapping screw to each top bracket, and attach
3
/8-16 bolt
to each top bracket. Bolt thread through weld-nut on rail (beam support).
6. Reassemble bottom cover on cheesemelter (8 screws).
7. Attach shelf to back riser if included.
GAS CONNECTIONS
CAUTION: All gas supply connections and any pipe joint compound used must be resistant to
the action of propane gases.
Codes require that a gas shutoff valve be installed in the gas line ahead of the cheesemelter.
Install the pressure regulator to the top gas connection. The arrow on the regulator indicates the
direction of the gas flow (Fig. 7).
The regulator must be installed within the tower in an upright position. If it is mounted in any other
position, the pressure must be reset (Fig. 8).
Fig. 7 Fig. 8
PL-40722-1
TOP
SUPPORT
BRACKETS
PL-40723-1
TOP SUPPORT BRACKET
RAIL
PL-40724-1
GAS CONNECTION
GAS PRESSURE
REGULATOR
PL-40725-1
GAS PRESSURE REGULATOR
IN UPRIGHT POSITION