Zanussi ZDG 862 Oven User Manual


 
INSTALLATION Solid Pipe Installation
FITTING THE APPLIANCE AND CABINET.
Make suitable arrangements for gas and electrical supplies into the installation site. Preferably a junction
box or 3 pin earthed socket should be situated at the back of the cabinet below the oven.
2 The electrical connection to the appliance is at the rear bottom right hand side, the junction box or socket
should be positioned accordingly.
3 Fit cabinet as Fig. 1, making sure that it is level.
4 When unpacking the appliance keep it on its polystyrene base until it is put into the cabinet to avoid
damage. Do not allow young children to play with any part of the packaging. After installation, please
dispose of the packaging with due regard to the environment, your local authority can arrange this.
NOTE:
It is imperative that the appliance is left in the base to protect both the appliance and the floor.
5 Remove the oven and grill doors
i) Open door fully.
ii) Rotate the hinge stirrups to there forward position (See Fig. 2).
iii) To remove the door, clear the hinges by raising the door slightly whilst pulling towards you.
6 Remove the fascia panel .
i) Remove the gas control knobs, springs, bezels and timer control knobs.
ii) Remove the four screw (two each side) which are visible on the underside of the fascia. Fig. 3.
iii) Tilt the bottom of the fascia panel out over. Withdraw the fascia panel by moving it down over to
disengage it from the top fixing lugs. Take care not to lose the 2 rubber grommets from the timer.
NOTE: The thermostat and grill discs will remain attached to the fascia panel. When refitting the control knobs
and bezels, the drive pins on the rear of the bezel must first be located in the disc carrier. The knob and spring
can now be fitted onto the control spindle. To prevent the top fascia panel mounts becoming slack, it may be
necessary to adjust the top fixing lugs.
7 Solid gas pipe installation:
i) Slacken and remove the union nut on the gas supply elbow on the right hand side of the control
panel. See Fig 9.
ii) Remove the two screws on the gas inlet block Fig.5.
iii) Withdraw the gas inlet block and pipe assembly from the back of the appliance.
iv) Remove the union elbow from the inlet block and pipe assembly. The elbow will be required in the
final installation.
v) The union elbow should be connected to the gas supply pipe via a standard ¼" B.S.P. straight connector.
41
GAS INLET SUPPLY BLOCK
680
280
120
120
Fig.5