Zephyr COK-E36SX Ventilation Hood User Manual


 
Installation - Internal Blower
9
5. Remove existing grounding screw and
attach grounding wire from capacitor box.
6. Re-attach grounding screw to nish
installation of capacitor box. Refer to Fig-A on
previous page.
7. Attach short capacitor connector to blower
connector.
8. Attach long capacitor connector to control
board connector.
9. Use plastic tie to hold wiring together. 10. Remove wood block
Final view of internal blower install.
Continue to page “12” for hood installation instructions.