Zephyr COK-E36SX Ventilation Hood User Manual


 
13
Installation - Mounting Hood
gap between
bracket and
wall
Top
Bottom
1. Place wall brac
ket on line C. Positiontopof wall bracket so it is even with the 21” mounting spread. Make
sure bracket is attached to wall as shown in the diagram.The top of the wall bracket should have a gap between
it and the wall.The bottomshould be ush against the wall. Use (3) 2” woodscrews to attach bracket to wall. Use
anchors if not mountingto studs.
2. Lift hoodontowall bracket, there is a lip on the back of the hood which willrest on the wall bracket. Secure in
place by *screwing(2) screws withwashers throughhoodintothe wall.There are two holes at the bottominside
the hoodin which to do this.
3. Place telescopic duct covers on top of hoodand extend topduct cover to the ceiling bracket. Attach duct cover to
ceiling bracket withthe providedscrews.
4. Run duct work downto topof motor. Attach electrical wiringfrom ceiling to wiringon top of motorhousing.(slide
duct cover up towards ceiling to gain access to the motorhousing)
* Note: If installing onto drywall only with no wall studs present, attach EZ anchors (not provided) into the wall.
Please see page 15 for external blower installationinstructions.
B
A
C
Attach screws to both
sides of the duct covers
and secure to ceiling bracket.
Electrical
10”