A SERVICE OF

logo

PitcoSolsticeandSolsticeSupremeHighEfficiencyGasFryers
SG/SSHSeriesServiceManual 32
6. Remove the fittings and plate from the gas valve
using a 7/16 inch open-ended wrench.
7. Install the heat shield, vent tube, and fittings.
8. Reinstall a new gas valve by following steps 1
through 6 in reverse.